Sorry! Can\'t be done!
logo

tristar mppt dip switches

I hope this makes sense. And get a static IP address on the internet for your router. We have a hydro unit producing now 700watts into batteries with a TS-45 PWM Load diversion to a hot water cylinder. It does work. user adjustable for 2 to 10 hours on or for on all ngiht. I hope this helps. I dont know much about AC, but isnt that easy to do with something like a dimmer? The spec suggest up to 125VDC input (when set for 48v systems) so what does that mean? However once the wind turbine starts to work it will push the voltage up to the point where the solar charge controller limits the solar power. You can use two of them like that in fact. Copyright 2023 Marlec | Business Website Development 2buy1click Ltd. The stages are: bulk, abosrb, float, equalise. Its a bit like having multiple cooks in the kitchen. so it will not divert at a lower voltage. Just make sure all the settings are close to what the battery thrives on. I see charge control (diversion) as a separate issue from MPPT and I use a tristar for that. I would disable the Frequency shift power control and use the solar for heating water via your diversion system if possible. The voltage is regulated in this way. (LiFeP04) But at the second scheme I do not see the dumpload connection anymore.???? The half wave switching made my lights flicker unacceptably. Hugh, Hi Hugh, great info, very helpful. 2. Those are Victron made, with own charging algorithms. Point to use diode is that i dont want to burn any other power from battery to dump load .. and let Victron finalize charging. To speak to a sales engineer to help you select the right solar controller call+44 (0) 1536 201588now, Your email address will not be published. One battery charger (when on shorepower). With over 4 million products sold in over 100 countries since 1993 functioning in some of the most extreme environments & mission-critical applications in the world Morningstar Corporation is truly the leading supplier of solar controllers and inverters. Morningstars stable management along with the lowest employee turnover rate has led to our success. I am confuse about the reading of 5 volt dc at the water heater for dumpload. In addition to my wind turbine I would like to install solar panels for charging the batteries. Your email address will not be published. How do I make all of this work??? Any other ideas about why? Originally part of Berkshire it is now in Oxfordshire. A simple full-cycle rectifier would bring the voltage too high, but maybe a half-cycle (single diode) could do the job (with a big enough capacitor)? With over 4 million products sold in over 100 countries since 1993 functioning in some of the most extreme environments & mission-critical applications in the world Morningstar Corporation is truly the leading supplier of solar controllers and inverters. Morningstars stable management along with the lowest employee turnover rate has led to our success. i have additional 2125 solar panel 12v Or go for the 600V controller but that is rather expensive. i have a charge controller PMV TS 60. If the cable run is short and the owner will not change the battery voltage then changing the alternator stator winding may be a better (simpler) option than transformers. I will do some tests (current and voltage waveforms) on this before putting this into the real battery. I hope that helps. TS-MPPT-45 in Box by Morningstar | Solar Charge Controllers | Future 3 hours later the coffee was stone cold and I was still reading the book. document.write(new Date().getFullYear()) Morningstar Corporation. Question is, can i use ts-60 .. with dump load .. instead battery, to use big electrolyte capacitor .. as power source, and feed current to busbars through bolt diode? 2 X 12v 102Ah Deep Cycle Batteries or should I get the 105Ah? And I see no benefit to it either. High efficiency, fast MPPT controller. There are crude controllers on the market that use a large relay to switch the wind turbine from charging the battery to feeding a resistor. For example the sun is shining and no wind. document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); Marlec Engineering Co Ltd Rutland House Thanks for the reply. I dont think you need a 60A controller. do you know any eshop in UK selling dump loads? My guess is that you have bad connections in the system. Check the dip/configuration switches inside the controller. We are using an Outback grid tie inverter (24v), which does not like to voltage spikes created by the turbines. Is a Tristar working better, than the AUX Outputs of either the FM80 or Inverter? 7 on for diversion charge control mode The Morningstar software team develops software architecture that extracts the maximum performance possible from the battery. Could the Morningstar relay driver triggered by a high battery voltage be used? Mostly it is a waste of fuel though. DIP Switch SettingsIf des Do not connect the controller to the turbine. Setting the tristar charging voltages above the SIs ones should prevent wasting generator power in the diversion load. Hello, Can the TS-45 take the 24v input and transform down to 12v? Morningstar provides some really neat free software to use with their solar PV charge controllers. I have TriStar TS-45 that I was using for my 12v PMA turbine. EN. If the Tristar is controlling the solar and you also have wind without control of=r the wind turbine diversion is set higher than the solar then you can get high voltage disconnect in the solar controller. Possibly there are some inductive kicks off the alternator winding when the tristar does its switching. A solar panel has a lower Voc so it is safe to connect like that. Id say 30 minutes should cover all aspects of my questions. charge controllers will draw the power for self operation from the battery strings that aren't going through the diodes. Were located in an area 300 m high and sandwiched between two mountain ranges so although great in summer, bad in winter and require the extra to top up our battery bank and reduce/eliminate the petrol gen use. I did email Morningstar technical 4 months ago when I set everything up and they replied within a day to say it was fine to have the two controllers together but suggested the mppt do the equalizing due to the higher voltage. I would use the tristar with a suitable dump load around one ohm and one kilowatt. Connect them in parallel. When the duty cycle reaches a high enough level to show that you have surplus power (say more than 20% for more than one minute) then turn on the pump relay for a minimum run of (say) two minutes or whatever. presumably in series. A better solution for isolating the tristar is to use a separate rectifier (if you have access to the ac wiring at all). TriStar TS-MPPT-30 Installation, Operation And Maintenance Manual But in the event that you dont have a manual handy, you can also find these dip switch settings on the inside of the removable wire cover, and on the inside of the Wire Box accessory. Or if you prefer to heat water, and dont like using DC loads then the relay driver might be a good choice as you can switch an AC heater on and off using your inverter to heat water and regulate the battery that way. You can use a windmaster with a 48-V winding in the turbine. A heater is ideal for surplus power provided that you dont mind variable, unreliable heat. 4 off Fieldlines forum the best discussion board, PowerSpout manuals and guides (list of document links), Installing and configuring a Tristar controller for a wind system, Using a high power resistor as a dump load. If you never need to top up then set a higher voltage. sir, is it recommended to connect 140w/12v of Mono-crystalline together with 140w/12v of polycrystalline panel on PWM 45amps Tri-Star regulator. If you turn off the MPPT then the battery voltage will fall and the PWM will start, so that is normal. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . Just connect the solar PV in parallel and then through the TS controller to the battery. OK I have looked back over all of this and it started 2 years ago but it seems to me that you have the solar and the wind turbine both connected to the battery (as in figure 2.2c), and then you have this Tristar 60 and only enough resistance to dump 48 amps (at 100% duty). I recommend that you use a 48V wind turbine to charge a 48V battery. (24v system) Re: TRIStar MPPT 45 Custom Settings with switches 6-7-8 set to on-on-off i see a problem here in that you are trying to charge multiple banks of 12v l16 strings and some are isolated with a diode. Yes your system will work with about 100Ah of battery. Also for: Ts-mppt-45, Ts-mppt-60. when i check the diagnostics, it shows state: bulk. This will add to the PV current although it may still turn off before the MPPT due to slightly different eq settings. To: jytte. Dear sir, We offer the range with built in display as standard in models suitable for 12V or 24V. Current does not fall to zero until a much higher voltage. imac 27'' late 2013 lcd replacement; how to transport electric bike. Sailing vessel, two battery banks, all AGM, house 3x8D 225 Ah each and starting(secondary house) 3 x 92 Ah. Cheers You are using diversion to control the charge. The diversion controller can be used to manage the battery charging, yes but take care that is is well sized and well cooled because there will likely be a lot of energy dumped and if it fails there could be damage to the battery and danger of explosion. We have a spare TS45 and curious to know the best way to switch between the hot water dump and air dump. Better 300W. Appendix 2 - Diversion Charge Control DIP Switchsettings. Morningstar in their diversion manual do say that two tristars can be used for diversion but im unsure how to set that up and if we can get them to talk to each other. http://scoraigwind.co.uk/relay-driver-for-load-management/, hi hugh , yes i meant feed power from one mpw to another mpw , I feel a little foolish as I hadnt realized the power from the dump load wasnt dc , I am a joiner by trade so electronics are new to me so please bare with me . cheers, The thing is just that the power plant is in the shed, which is 50m away from the house, cables are laid already, and there is no provision for a low voltage cable. Having said that, it would probably work quite well provided you use enough capacitance. On a wind system you should use it to control a dump load so as to limit the current to the battery by diverting some to dump. sorry for the loose wording. Subject: Re: A Wind Turbine Recipe Book You can use a string of diodes to drop up to about 4 volts but if you reach 5 volts, the tristar will register an error. Take care the hydro does not exceed 150V DC on open circuit or you will damage the tristar MPPT. If below then you will get maximum diversion, which is ideal for heating water. Use a relay with normally closed contacts to bypass this diode in normal conditions but when the generator comes on the relay is energised, contacts open and the supply to the sensing contacts is via the diode and hence about 0.7 volts lower than battery voltage. There is another way for them to communicate for establishing the best charging state??? As discussed on the phone, you can use 3 TS45 controllers in parallel, each one operating a 1kW 24V heating load. This is the second in the series of videos on MSView Setup Wizard Custom Settings. 71 Share 17K views 7 years ago This is the second in the series of videos on MSView Setup Wizard Custom Settings. north star tools near hamburg; 2005 honda accord oil filter location; self-cleaning y strainer how can i connect the controller with dump load and inverter ? Load control can beadjusted via meter display. This might be feasible using half wave rectifier and a very huge capacitor as discussed before. 5 solar panels of 250 watts each at 24 volt I have a communication station on a mountain, so, we have installed a solar panel over there. The TriStar is a three-function controller providing reliable solar battery charging, load control or diversion regulation. So what would be the best resister to have ? i am only using solar at the moment so taken a long time to recharge my 800 amp hours of battery bank. Yes indeed I often do this. Hugh. cheers, This website uses cookies. Would like to take my lights off the grid, total watts(300w) Im still unsure whether to buy controller, or make simple one based on plans available on net. The solution is the set dip switches 2 and 3 to suit your battery. The topic has been touched upon above, but not conclusively (or at least not conclusively enough for my level of knowledge). Robert. well its hard to say. You can monitor and alert yourself to these condition as they occur and react to a problem situation before resulting in a failed solar charge controller. This website uses cookies. Any advice on settings/circuit breakers,etc would be highly appreciated, Im also new to this: ) Thank you, Craig. Dov, OK topic one. Hi Matthew, 2 On (12v) I hope this helps. Connect the turbine to the battery with a rectifier. The maximum voltage (Voc) is much too high. If I understand your response to Ben, PWM will work on an FM80 AUX terminal presumably set as Diversion:Solid ST, albeit with noise. i do have the turbine grounded,but at the moment it is on the ground. So when they are all three connected there is actually only one system voltage which is determined by the state of the battery(charged/discharged) and by its rate of charge. The first is TS-MPPT-60 for solar panels and the second one is TS-60 with dump load for windmill. battery bank is now back up to something reasonable. Any thoughts? Or you might want to keep FSPC and use the SIs own diversion control relay option but I find that pretty clunky. Hi Hugh. I tough about that but wasnt surethks Personally Id have two diversion controllers instead but I suppose this should work provided you are right about the Voc figure. Learn more in our updated, New Integrated Series and DC Charging Components. Thanks for the good comments. I am not going to argue with you about the power rating, Doug, but simply state that I would not push that stator above 500 watts for too long. I know my solar controller is a MPPT version and does this for the 24v solar panels, but the TS-45 is PWM spin have my doubts. Solar iBoost+ UKs Favourite PV Immersion Controller, Efficiently uses the solar energy to fully recharge the battery, Prevents overcharging and excessive gassing of the battery, Prevents undercharging and sulphation of the battery, Provides status information and the controller and the system. I will run all the lights and fridge and water pump. TriStar MPPT 60 A charge controller: Yes: 800 W . Ill see if I can find a diagram for you. This website uses cookies. If necessary you can use more than one Tristar controller in parallel. http://scoraigwind.co.uk/relay-driver-for-load-management/. A short walk from the end of the village leads past Buscot Weir field to Buscot Lock on the River Thames. This means programming the relay driver with a computer (windows laptop usually) via RS232 dongle. Have fun! the body is Aluminium alloy and stainless steel components with 3 blades Glass Reinforced, Rotor Diameter: 1 metre. I bought an Air-X turbine, which turned out to be a 24v version. I have a question regarding the Tristar MPPt 60 amps: My current installation is a wind turbine of diameter 2400 in 24v, Make sure the Tristar is working, or the turbine may damage the battery. Outdoor rated connecting wires for waterproof connection to solar module and battery. I know that the installion will make 50A and 42V( wind and solar combined), Is this ok for a 12volt Battery? hi, If the Tristar shuts down, or its load fail to work then your battery could ultimately explode. Do not place it between the mains grid input and the battery. The solar modules will probably put out about 8 amps each (total of 16A) so a tristar 45 is plenty big enough or you could use a 20 amp controller pretty safely instead. Temp comp set to 0/deg. SureSine inverters, GenStar MPPT DC charging systemCLICK HERE TO FIND OUT MORE. I wonder if you could change the heater for a smaller one or find a DC one to fit the tank or use it in series with another heater to reduce the current it consumes? thanks again for the help and advise The right configuration is in a diversion mode or Solar Charging and Load Control mode? Make sure a heater is connected. Its a nice product and has increased the output of my wind turbine slightly. 65 volts is very high for charging the batteries. Vmp:22.6 Or can the turbine just feed in, if the solar output voltage ist low enough? off-off-on will probably work best. This will regulate the battery very precisely and allows for the turbine producing a bit more than it is rated to. I understand this should be fine but the key to this working right is the voltage settings on both controllers. Connect all of the batteries together as one and keep them charged up (until the wind stops and you need to use them). However on good sun days, which is most days in the Caribbean, most of the Kiss output during the day is surplus, and in the evening the output will slowly change from surplus to usable to charge the batteries, as I use lights and fans, and of course the fridge continues on. Is the pwm controller in diversion mode or solar mode? With the solar source directly connected to the battery, and the controller just diverting power when the battery is charged, I was wondering if the battery missed out on the more gentle PWM charge modes, and the last stage of charging to ensure maximum capacity. And I made an 3 x 1.5 kw = 4.5 kw 48 volt imersion heater dumpload to go in to the CH system Other turbines may see more dramatic results. I can supply an LDR 96-15 if you need one. What you recommend? 24 Volt, LVD Low Voltage Override Protection Morningstar TriStar MPPT 45, MPPT Charge Controller, 45 amp, 12, 24, 36, 48 Volt, . See http://scoraigwind.co.uk/relay-driver-for-load-management/ This must be done well or the battery life will be disappointing. I hope this helps. Batteries and solar may be added later, as funds allow, but for now it is a grid tie only system, and it sounds like the Tristar could recoup wasted energy and smooth the input for the inverter.

Michaels Account Sign Up With Phone Number, High Schools In Paris, France, Ucsp Quarter 2 -- Module 9: Social Stratification, Articles T